Edition 1.0 · September 2026
| Jurisdiction | Malaysia |
| Legal system | Common law |
| Contract forms | PAM 2018 (6th Edition), PWD 203A |
| Subjects | Payment, delay, variation, termination, adjudication |
| Project stage | Administration, claims, dispute resolution |
| Intended reader | Contractors, consultants, quantity surveyors, engineers, adjudicators, lawyers |
| Format | EPUB + PDF |
| Language | English |
| Legal currency | Law and authorities current to 31 August 2026 |
| ISBN | 978-967-XXXX-XX-X |
This book provides a detailed post-mortem analysis of construction disputes that have been adjudicated, arbitrated or litigated in Malaysia. Drawing on reported cases, published adjudication decisions and the author's experience, each chapter dissects a specific category of dispute — payment claims, extension of time, variations, defective work, termination and liquidated damages — to reveal the patterns of failure that recur across projects.
The book does not merely summarise the law. It reconstructs what happened, explains why the parties' positions failed or succeeded, and identifies the practical steps that contract administrators, quantity surveyors and engineers should take to prevent the same disputes arising on their projects.
This book does not cover: International arbitration, projects outside Malaysia, or FIDIC-specific procedures (see FIDIC Contracts: A Practical Guide).